What harmonised standards provide
A harmonised standard is a technical standard whose reference is published in the Official Journal of the European Union. If you build your machine to such a standard, the presumption of conformity applies. A supervisory authority then assumes you meet the requirements the standard covers. That saves you the burden of proof.
Article 20 of the Machinery Regulation sets this out. A product that conforms to harmonised standards whose references have been published is presumed to comply with the essential health and safety requirements of Annex III that those standards cover. The standard translates the legal requirement into a concrete design solution.
The presumption of conformity is an advantage, not an obligation. Harmonised standards are voluntary. You may choose another technical solution, but then you demonstrate yourself that you cover every relevant requirement of Annex III. The standard makes that proof simpler and more predictable.
Why there are no harmonised standards under the Machinery Regulation yet
The Commission has tasked the European standardisation organisations with drawing up the standards for the Machinery Regulation. That work is still ongoing. As long as a standard reference is not published under the regulation in the Official Journal, that standard gives no presumption of conformity for the new requirements. The existing standards still belong to the old directive.
Under Article 20(2), the Commission requests one or more standardisation organisations to develop the standards. Since 2023 CEN and CENELEC have been reviewing over seven hundred existing standards for whether they sufficiently cover the new and amended requirements of Annex III. That analysis has been submitted to the Commission in parts, most recently in August 2026.
That the existing standards still fall under the old directive is clear from Commission Implementing Decision (EU) 2026/2015 of 4 September 2026. With it the Commission updated the harmonised standards under Directive 2006/42/EC, which remains in force during the transition. A listing under the old directive gives no presumption of conformity under the new regulation.
The Commission has indicated it will make the first list under the regulation available by the end of 2026. Bear in mind that some standards will be listed with a restriction and that revised standards will only follow after January 2027. For new requirements no standard is ready yet. A restricted listing covers only the requirements the standard does address.
What the date 14 January 2027 means
The Machinery Regulation applies to placing machinery on the market from 14 January 2027. On that date the old Machinery Directive 2006/42/EC is repealed. Machines you lawfully placed on the market before then do not have to comply with the regulation after all. If you substantially modify such a machine, that changes.
There is confusion about that date. Many sources still cite 20 January 2027. The authentic text of Article 54 on EUR-Lex gives, in both the Dutch and the English version, 14 January 2027. That is the applicable date after a corrigendum. Keep to it.
The absence of a standard listing does not postpone the application of the regulation. From 14 January 2027 you meet the essential health and safety requirements, with or without a harmonised standard. Only the easy route to the proof, the presumption of conformity, is then not yet available for some machines.
Why this affects your conformity route
Without harmonised standards, the route of self-certification falls away for some machines. Machines in Annex I Part B may only receive the CE marking with internal production control if standards cover all relevant requirements. If those standards are missing, a notified body has to be involved. That costs lead time and money.
Article 25 links the assessment route to the category of your machine. For the highest risk categories of Annex I Part A, self-certification is excluded anyway. There a route with a notified body always applies: EU type examination with internal production control (module B with C), full quality assurance (module H) or unit verification (module G).
For machines in Annex I Part B you may apply internal production control (module A), but only if you build the machine to the harmonised standards or common specifications that cover all relevant requirements. If there is no covering standard, Article 25 requires you to switch to module B with C, H or G. The notified body then comes in.
| Machine category | Route without a covering standard |
|---|---|
| Annex I Part A (highest risk) | Always via a notified body: module B with C, H or G |
| Annex I Part B | Self-certification (module A) falls away, then module B with C, H or G |
| Not in Annex I | Self-certification (module A) remains, you demonstrate all requirements yourself |
For machines not listed in Annex I, module A remains available under Article 25(4). Even then you must demonstrate that you meet all applicable requirements. The difference is in Annex I: precisely there, where the law requires a standard for the lightest route, the absence of standards hits you hardest.
Not sure which route your machine must follow?
Let us know briefly which machine it concerns. We will get in touch with what we can do and what it costs.
What to do now
Do not wait for the first list of standards. Go through the essential health and safety requirements of Annex III for your machine, and set beside each requirement which standard you currently apply. Determine where coverage is missing. Reserve capacity at a notified body in good time if your machine needs that route.
The analysis does not have to wait for the publication of the standards list. You can already establish where your machine stands:
- Go through the requirements of Annex III and determine which apply to your machine, with extra attention to the new and amended requirements.
- Set beside each requirement which standard you apply and which part of the requirement that standard covers.
- For the gaps, find an equivalent technical solution, supported by a risk assessment, verification and technical documentation.
- Determine your route on the basis of Article 25 and the category of your machine.
- Reserve a place at a notified body in good time if you need one, because capacity is limited.
If you substantially modify an existing machine, under Article 18 you are considered the manufacturer for that machine. If you do so on or after 14 January 2027, the modified machine falls under the regulation, even if the original model still fell under the directive.
- Regulation (EU) 2023/1230 on machinery, Article 20 (presumption of conformity) and Article 25 (conformity assessment), text on EUR-Lex
- Regulation (EU) 2023/1230, Article 54 (applies from 14 January 2027) and Annex III, text on EUR-Lex
- Commission Implementing Decision (EU) 2026/2015 of 4 September 2026 on harmonised standards under Directive 2006/42/EC, text on EUR-Lex
- Regulation (EU) No 1025/2012 on European standardisation, Article 10, text on EUR-Lex
Lawyer with a background in e-commerce. Writes about the rules he applies daily in files for brands and manufacturers. More about Francois or connect on LinkedIn.
Frequently asked questions
Can I still CE mark my machine under the Machinery Directive before 14 January 2027?
Can I CE mark without a harmonised standard?
When will the first list of standards under the Machinery Regulation arrive?
Is 20 or 14 January 2027 the correct date?
Rather have the route determined for you?
For machine builders and importers we determine which conformity route your machine follows and draw up the technical file that holds up. A proposal with a fixed price within 24 hours.
See the CE process